Thilawa Waste Treatment Facility Construction Project involves the Steel Structure, Supervision, Construction works. Responsible for the detail works which are included as follows.
♦ Fabrication and Erection works of Long span Steel Stress frame and roofing work at Sorting and Stabilization Facility building (11652 Sqft)
Client ::
- Dowa Eco-System Company Limited
- Seogwoo E&C
- Parami Energy Pipe-line Construction Co., Ltd
Location ::
Thilawa SEZ, Thanlyin Township, Yangon Region.
Period ::
May-2015 to Sep-2015
♦ Fabrication and Erection works of Long span Steel Stress frame and roofing work at Sorting and Stabilization Facility building (11652 Sqft)
Client ::
- Dowa Eco-System Company Limited
- Seogwoo E&C
- Parami Energy Pipe-line Construction Co., Ltd
Location ::
Thilawa SEZ, Thanlyin Township, Yangon Region.
Period ::
May-2015 to Sep-2015