Natpalin Monastery Damyone Hall Construction Project involves the Detail Design, Inspection & QA/QC, Steel Structure, Supervision, Construction works. Responsible for the detail works which are included as follows.
♦ 80 feet span steel truss design with angle bar.
♦ Plot posts with structure steel pipe connect with RC and Brick walling.
♦ 3 Stepping roof at monastery room follow Myanmar tradition design.
Client ::
TOP Engineering Consultants International Co., Ltd.
Location ::
Pagan, Nyaung U Township, Mandalay Region.
Period ::
Jun-2014 to Aug-2014